Reliability Basis Optimization (RBO) at Eskom

Reliability Basis Optimization (RBO) at Eskom

Reliability Basis Optimization (RBO) at Eskom Head Office and Coal Fired Power Stations Electrical Utility in South Africa 2007 – 2015 ARINT has been requested by ESKOM to develop an Asset Management Process that is simple and user friendly yet effective and...

Risk Based Inspection Programme at Eskom Head Office

Risk Based Inspection Programme at Eskom Head Office, Coal Fired Power Stations and Koeberg Nuclear Power Station (Secondary Plant and Auxillaries) Electrical Utility in South Africa 2012 – present Eskom has embarked on the Risk Based Inspection programme for...

Eskom Medupi Coal Fired Power Station

Eskom Medupi Coal Fired Power Station (under construction) Electrical Utility in South Africa 2012-2015 Participation in the Construction and Commissioning of Medupi Power Station through our role as Engineers determining the RBO plant equipment strategies, spares...