Reliability Basis Optimization (RBO) at Eskom

Reliability Basis Optimization (RBO) at Eskom

Reliability Basis Optimization (RBO) at Eskom Head Office and Coal Fired Power Stations Electrical Utility in South Africa 2007 – 2015 ARINT has been requested by ESKOM to develop an Asset Management Process that is simple and user friendly yet effective and...
Klipspruit Colliery

Klipspruit Colliery

Klipspruit Colliery (Ogies – Mpumulanga) Coal Mine Group in South Africa 2007 – 2008 During the different design development phases, ARINT SA facilitated the Structured What-If? and Process HAZOP risk assessments as well as Constructability & Maintainability...

Risk Based Inspection Programme at Eskom Head Office

Risk Based Inspection Programme at Eskom Head Office, Coal Fired Power Stations and Koeberg Nuclear Power Station (Secondary Plant and Auxillaries) Electrical Utility in South Africa 2012 – present Eskom has embarked on the Risk Based Inspection programme for...

BHP Billiton (now Glencore) Optimum Water Management Project

BHP Billiton (now Glencore) Optimum Water Management Project Coal Mine Group in South Africa 2009 – 2010 During the different design development phases, ARINT SA facilitated the Structured What-If? and Process HAZOP risk assessments as well as Constructability &...

Endel at Eskom Kusile Coal Fired Power Station

Endel at Eskom Kusile Coal Fired Power Station (under construction) Constructor in South Africa 2015 – present Endel has been appointed as the Turbine Piping Welding Contractor for Kusile Unit 3. ARINT SA is assisting this company with Project Management and Site...